# Preparing walls before painting

4 min read · Updated 23 October 2026

Paint holds on a clean, sound, dry surface and fails on a dirty, flaking or damp one. What you need for preparation depends on what the walls are like now, so look at them before you buy anything.

Built with AI tools; not yet checked by a tradesperson.

Read here; this page sends and keeps nothing.

[Work out the paint for this room, then change it to yours](https://buildbatch.co.uk/start/#v=1&job=paint&walls=paint&ceiling=paint&trim=none&units=m&length=4.2&width=3.6&height=2.4&door=0.826x1.981&window=1.2x1.1&surface=sound&subfloor=unsure&ground=unsure&fitting=unsure&end=15)The planner can count a shop's own tins, so its count may differ.

![A wall with sanded patches of white filler, and a filling knife, a sanding block and a bucket on a dust sheet.](https://buildbatch.co.uk/img/guides/preparing-walls-before-painting.webp)

## The basic list for a sound, previously painted room

- **Sugar soap or wall cleaner.** Paint grips a clean surface. One container does a room.
- **Filler** for cracks and screw holes. A small tub or a tube is usual for a sound room.
- **Decorator’s caulk** for the gaps along the top of the skirting and round the door and window frames, and for a crack where the walls meet the ceiling. A cartridge of about 300 ml typically runs about 10 m as a 6 mm bead; a wider gap takes more, and the cartridge says how far it goes.
- **Abrasive paper or sanding sponges** for rubbing down filler and keying the surface.
- **Masking tape**, typically in 50 m rolls and also sold in 25 m, or a cutting-in brush and a steady hand instead.
- **Dust sheets** for the floor and the furniture. A cotton sheet is typically 3.6 m × 2.7 m.
- **Tools:** a roller frame with a sleeve for each paint, a tray, a brush for cutting in, an extension pole for the ceiling, and a filling knife and scraper.
- **A dust mask, eye protection and gloves.** Sanding makes dust; cleaners and fillers are best kept off skin and out of eyes.

A sound, previously painted matt surface usually needs no primer. Check the paint’s instructions for a strong colour change or a glossy surface.

## Six answers that change the list

BuildBatch asks what the surface is like now. Each answer changes the preparation lines.

1. **Previously painted and sound.** The list above.
2. **Bare or new plaster.** Bare plaster soaks up paint. It needs a mist coat (emulsion thinned as the tin says) or a primer-sealer before the top coats, and two top coats straight onto bare plaster may not cover. The list counts the mist coat on a line of its own, one coat of white contract matt. The paint’s instructions decide the dilution or the primer, and whether two top coats are enough after it. How much water each maker says, and how long to let it dry: [mist coat ratio and drying time](https://buildbatch.co.uk/guides/mist-coat-ratio/).
3. **Stains showing through.** Find the cause first. Then a stain-blocking primer on the affected patches; how much depends on the size of the patches and the primer’s own coverage figure.
4. **Damp or mould.** Paint will not cure either. The cause has to be found and fixed, and the mould treated, before any paint goes on. Mould treatments carry their own safety instructions: ventilate, wear gloves and eye protection, keep children and pets away. If the cause is not obvious, get advice.
5. **Flaking, powdery or glossy paint.** Flaking or powdery paint comes off back to a sound edge, and the surface is filled and sanded. Glossy paint is keyed or primed so that emulsion grips. Expect more filler, more abrasive and possibly an adhesion primer; the paint’s instructions say which.
6. **Wallpaper, textured coatings or a mixture.** Identify the surface first. Each needs its own preparation before emulsion.

## Before you sand or scrape anything

Older paint can contain lead, and textured coatings applied before 2000 can contain asbestos. Do not sand or scrape a coating you are not sure about; get advice first.

## Worked example

The example room, 4.2 m × 3.6 m × 2.4 m with one door 826 × 1981 mm and one window 1200 × 1100 mm, has 34.484 m² of wall and 15.12 m² of ceiling: about 49.6 m² to wash down, and a 15.12 m² floor to sheet. Its edges, where the walls meet the skirting, the ceiling and the frames, come to about 41.4 m.

- **Masking the lot:** one 50 m roll, or two 25 m rolls.
- **Cutting in with a brush instead:** most of that tape is not needed.
- **Caulk:** 3 cartridges of about 300 ml for the 24.2 m along the top of the skirting and round the two frames, at a typical 10 m a cartridge as a 6 mm bead, the middle of six makers’ data sheets. Seal only where there is a gap; a crack where the walls meet the ceiling takes more.
- **Dust sheets:** 2 sheets of the typical 3.6 m × 2.7 m cover the 15.12 m² floor once; the furniture needs more.

## The order of work

1. Clear the room and sheet the floor.
2. Wash down and let it dry.
3. Fill, then sand the filler flush.
4. Caulk the gaps and let it set.
5. Mask, if you are masking.
6. Mist coat or primer where it is needed, then cut in and roll the top coats.

## Do it with BuildBatch

Open the [planner on paint](https://buildbatch.co.uk/?job=paint), type the room, and say what the walls are like under “What the surface is like now” in “Change the figures”. “See the list and buy” shows the preparation lines to match, each with why it is there and what decides the quantity; a line that waits on an answer asks its question.

## What this guide does not cover

Quantities of filler, caulk or primer, which the walls decide and the products’ own coverage figures turn into tubs and tins. Preparing woodwork. Plastering or skimming a wall that is beyond filling. Diagnosing damp. Testing a coating for lead or asbestos, which is a job for someone qualified.

## Related guides

- [Is paint coverage per coat? Yes: what m² per litre means](https://buildbatch.co.uk/guides/paint-coverage-explained/)
- [How much paint do I need?](https://buildbatch.co.uk/guides/how-much-paint-do-i-need/)
- [How to measure a room for paint](https://buildbatch.co.uk/guides/how-to-measure-a-room-for-paint/)
- [Mist coat ratio: Dulux 10:1, Valspar 3:1, Crown Trade 40%](https://buildbatch.co.uk/guides/mist-coat-ratio/)
- [Paint or lay the new floor first? Paint first, floor last](https://buildbatch.co.uk/guides/order-of-work-painting-and-new-flooring/)

## Questions

**Do I need a primer on walls that were painted before?**

A sound, previously painted matt surface usually needs no primer. Check the paint's instructions for a strong colour change or a glossy surface, and use a mist coat or primer-sealer on bare plaster.

**Can I just paint over a damp patch?**

No. Paint will not cure damp or mould, and it fails over both. Find and fix the cause first, treat any mould, let the wall dry, then paint.

A whole list worked out: [How much paint for a 3 x 4 m bedroom?](https://buildbatch.co.uk/examples/painting-a-3-by-4-m-bedroom/)

[Emulsions by name, each with its maker's coverage and tin sizes](https://buildbatch.co.uk/products/kind/emulsion-paint/)

[All calculators](https://buildbatch.co.uk/calculators/) · [Example lists and tables by room size](https://buildbatch.co.uk/examples/) · [What it costs to have it done](https://buildbatch.co.uk/labour-costs/) · [Where the figures come from](https://buildbatch.co.uk/sources/)