# MOT Type 1 calculator

Type 1 sub-base in bags, and its weight.

An example driveway

## A 6 × 3 m driveway, Type 1 sub-base

- **Type 1**: 8 bulk bags. about 6.4 t · 3 m³ needed. 0.07 m³ left over

Built with AI tools; not yet checked by a tradesperson.

MOT Type 1 sub-base for a path, a driveway or a shed base, in bulk bags or 25 kg bags, with its weight.

Want a figure before you measure? See [the bulk bags of Type 1 an area takes, by its size](https://buildbatch.co.uk/examples/how-much-mot-type-1-by-area/).

**Having it done, laying a gravel driveway:** labour only, £300 to £800 per job; with materials, £40 to £100 per m² and £1,200 to £2,500 per job; materials not stated, £40 to £100 per m². These are published UK figures, each its publisher's own, and not a quote: [every figure, its source and the sum for a room: laying a gravel driveway](https://buildbatch.co.uk/costs/gravel-driveway/).

**How the number is worked out, a worked example and questions**

## How the number is worked out

1. **Measure the area.** Its length and width, or its area, or draw its shape. Nothing is added past the edge: a base that runs past its edging is measured that much bigger.
2. **Choose what it is for.** The depth starts at the typical one for the use, compacted: 100 mm for a path or a shed base, the top of the figures in makers' and suppliers' guides, and 150 mm for a driveway, the figure five of them give; one supplier gives 150 to 200 mm. Type the depth decided for your job and that is used instead.
3. **The volume and the bags.** The area times the depth is the volume once compacted; 10% is added for spreading and an uneven dig, BuildBatch's own figure. A bulk bag of Type 1 makes about 0.38 m³ once compacted and a 25 kg bag about 0.012 m³, so no settlement is added. Until you choose, the count is in 25 kg bags where 20 of them or fewer cover it, and in bulk bags above that.
4. **What it weighs.** The bags at their own weight, about 800 kg a bulk bag, and the amount at a typical 2.1 t a cubic metre once compacted. More than 10 bulk bags is said to be a large amount, with a loose load by the tonne as the other way it is sold, worked at 2.3 t a cubic metre, the top of the figures, so the load is not short.

This is a material quantity, not a design. It decides no depth for the ground, no level, no fall and no drainage: those are a designer's, the product's instructions or building control's.

**Where the figures come from.** The 10% is BuildBatch's own allowance, not a maker's figure. The depths by use, the 1.3 times the depth it is spread at before compacting, and what a bag makes and weighs are typical figures, read on 12 and 30 October 2026, each with the page it was read on, on the [sources page](https://buildbatch.co.uk/sources/#typical-groundwork), with the [other typical figures](https://buildbatch.co.uk/sources/#typical-figures).

## A worked example

A driveway 6 m × 3 m is 18 m². Type 1 at 150 mm compacted, the typical depth for a driveway, with 10% for spreading and an uneven dig. The bags are counted from typical figures, not a product's own: what the bag you buy says comes first.

**Typical depth and bags; the 10% is BuildBatch's own**

| Working | Figure | Result |
| --- | --- | --- |
| Driveway area | 6 m × 3 m | 18 m² |
| Type 1, compacted, at the typical depth for a driveway | 150 mm | 2.7 m³ |
| With the allowance for spreading and an uneven dig | 10% | 2.97 m³ |
| In bulk bags of about 0.38 m³ once compacted, rounded up | **7.815789** | **8 bulk bags** |
| Or in 25 kg bags of about 0.012 m³ | 0.012 m³ | 248 bags |
| What the bulk bags weigh, about 800 kg each | 800 kg | 6.4 t |
| What 2.97 m³ weighs at a typical figure for Type 1 once compacted | 2.1 t a cubic metre | 6.237 t |
| How deep to spread it before compacting | × 1.3 | 195 mm |

The two weights differ because a bag is sold by weight and the amount is worked by volume: the bags are what to buy, and the weight says what a delivery or a trailer has to carry. Laid at 100 mm, the depth for a path or a shed base, the same area takes 6 bulk bags.

[Work it out for your room](https://buildbatch.co.uk/start/#v=1&job=groundwork&walls=none&ceiling=none&trim=none&units=m&length=6&width=3&surface=sound&subfloor=unsure&ground=unsure&fitting=unsure&groundwork=quick&groundwork.material=type1&groundwork.use=driveway&end=15), starting from the example driveway's sizes.

## Stop and check first

- **The depth is for the ground and the use.** Soft or clay ground, a van or a heavier car, or a base under a building may need more than the typical figure. One supplier's guide gives 150 to 200 mm for a driveway; the calculator counts the depth you type.
- **Compact it in layers.** Spread it about 1.3 times as deep as it is to end up, and compact it with a plate compactor in layers of no more than 75 mm.
- **A membrane on soft ground.** A geotextile under the Type 1 keeps it from being pressed into soft soil. The calculator counts its rolls as a check, lapped 900 mm at each join and roll end, the top of the makers' figures for soft ground, in rolls 4.5 m wide and 11 m long, a typical size of the rolls a driveway's geotextile is sold in: a 6 m × 3 m driveway takes one roll. Whether the ground needs one is the ground's.
- **A large amount.** More than 10 bulk bags is a lot to barrow: it is also sold as a loose load by the tonne, tipped from a lorry. Ask about the access, the smallest load and whether any left over can go back.

## Questions

**How much MOT Type 1 do I need for a 6 m by 3 m driveway?**

8 bulk bags at 150 mm compacted, with 10% for spreading: 2.97 m³, about 6.4 t of bags.

**How deep should a sub-base be?**

Most guides read give 75 to 100 mm for a patio or a garden path and 100 to 150 mm for a driveway, compacted; the calculator starts at the top of each, so the bags do not run short. One supplier gives 150 to 200 mm for a driveway for cars and light vans. The ground and the use decide the real depth.

**How many square metres does a bulk bag of Type 1 cover?**

About 3.8 m² at 100 mm and 2.5 m² at 150 mm once compacted, from a bag of about 0.38 m³ compacted: a typical figure, worked from what Type 1 weighs in place. What a bag says on its own label comes first.

**Why does the weight of the bags differ from the weight of the amount?**

A bulk bag is sold as about 800 kg; the amount is worked by volume at a typical 2.1 t a cubic metre once compacted. Both are shown, and the bags are what to buy.

**Can I put gravel on top?**

Yes: choose gravel over Type 1 and both layers are counted, the gravel loose at 50 mm, the typical depth for a path, a border or a driveway. The [gravel calculator](https://buildbatch.co.uk/gravel-calculator/) starts on gravel alone.

## Related guides

- [How much Type 1 and gravel do I need?](https://buildbatch.co.uk/guides/how-much-type-1-and-gravel-do-i-need/)
- [How much concrete do I need? (a slab's sub-base in bags)](https://buildbatch.co.uk/guides/how-much-concrete-do-i-need/)
- [How much sand and cement for a patio, and how many slabs?](https://buildbatch.co.uk/guides/how-much-sand-and-cement-for-a-patio/)

Everything is worked out in your browser, and BuildBatch never sends the figures you type unless you sign in to an account and save a project. BuildBatch counts which tools are used, without a cookie. The bag's own figure and the job's design come first. [How the estimates are worked out](https://buildbatch.co.uk/how-estimates-work/).