Mist coat ratio: Dulux 10:1, Valspar 3:1, Crown Trade 40%

6 min read · Updated 4 November 2026

Thin the emulsion as its own tin says: Dulux says 10 parts paint to 1 part water, Valspar 3 parts to 1, and Crown Trade’s Matt Vinyl 40% water. Let it dry before the top coat: Crown Trade says 4 hours at 20 °C for its Matt Vinyl, and Valspar’s guide says 24 hours. Valspar’s and Dulux’s guides each describe a mist coat, then the top coats; neither says how many, and BuildBatch counts one. At BuildBatch’s typical 12 m² a litre, with an example 10% spare, one mist coat on the walls of a 4.2 × 3.6 m room takes about 3.2 L of paint, before the water. That room is 2.4 m high, with one door and one window.

Built with AI tools; not yet checked by a tradesperson.

Read here; this page sends and keeps nothing.

Work out the paint for this room, then change it to yoursThe planner can count a shop's own tins, so its count may differ.

Three makers’ mist coats, in parts of paint and waterDulux: 10 parts paint to 1 part waterValspar: 3 parts emulsion to 1 part water, drawn as 9 to 3Crown Trade Matt Vinyl: 40% water by volume, read as 40 parts to 100 of paintOne part of paintOne part of clean water
Three of the four strengths in the table below, side by side: Valspar’s mist coat has more water than Dulux’s, and Crown Trade’s at least four times Dulux’s. Use the figure on your own tin.

The sum

  • Paint for the mist coat = the area × 1 coat ÷ what a litre covers × 1.1 for spare.
  • Water = the paint’s litres × the maker’s ratio.

A mist coat is one coat. The water goes on top of the paint’s litres, so it does not change how much paint to buy. Bare plaster drinks more than a sealed wall, so count it at BuildBatch’s typical 12 m² a litre (the lower middle of 18 makers’ emulsion figures: sources), not the tin’s figure for a painted wall.

Five makers’ ratios

Paint Water for the first coat on new plaster Ready-made instead
Dulux (any white emulsion, its advice page) 10 parts paint to 1 part water Dulux Sealer for Plaster
Crown Trade Matt Vinyl 40% clean water by volume Crown Trade Covermatt Drywall Primer
Valspar (its how-to guide for new plaster) 3 parts emulsion to 1 part water Valspar Universal Primer & Undercoat
Dulux Trade Supermatt Up to 1 part water to 3 parts paint
Armstead Trade Contract Matt Up to 1 part water to 5 parts paint

These are four strengths from five makers: Valspar’s 3 to 1 is the most water Dulux Trade Supermatt allows. Crown Trade’s has at least four times the water of Dulux’s, on either reading of “40% by volume”. Use the row for your own paint, or its tin’s own figure.

Worked example

A room 4.2 m × 3.6 m, 2.4 m high, with one door and one window: 34.5 m² of new plaster on the walls.

  • Mist coat: 34.5 × 1 ÷ 12 × 1.1 = 3.2 L of paint, so one 5 L tin of white contract matt.
  • Water, at Dulux’s 10 to 1: 3.2 ÷ 10 = 0.3 L.
  • Water, at Crown Trade’s 40%: 3.2 × 0.4 = 1.3 L.
  • Two top coats: 34.5 × 2 ÷ 12 × 1.1 = 6.3 L, so a 5 L and a 2.5 L tin.

With a new plaster ceiling too, the mist coat covers 49.6 m²: 4.5 L, still one 5 L tin. The trade mist-coats in a white contract matt, which comes in 5 and 10 L tubs. For other rooms, the table by room size gives ten, and the paint calculator works out the mist coat and the top coats for your own room once you say the plaster is new.

What changes it

  • The plaster must be dry. Up to 4 weeks, by Dulux’s rule of thumb. Wet plaster is darker: wait until it is one even, pale colour, or the paint cracks and peels.
  • Your paint’s own ratio. Check the tin says it can be thinned for a mist coat. Some say not: use a bare-plaster primer instead.
  • The drying time. Crown Trade’s Matt Vinyl can be recoated after 4 hours at 20 °C and 65% humidity, and Valspar’s guide says to wait 24 hours before the top coat. Crown Trade’s sheet says not to paint below 8 °C or above 80% humidity.
  • Spraying. Dulux Trade Supermatt thins up to 1 to 5 for airless spray, with a 517 to 519 tip at about 2,200 to 2,500 psi. Armstead Contract Matt thins up to 1 to 10, with a 517 tip. Neither gives a spray ratio for a mist coat itself: ring AkzoNobel’s technical line (0333 222 70 70) and test a patch.
  • Old walls stripped to plaster count as bare plaster. Old paint can contain lead, and textured coatings put up before 2000 can contain asbestos: do not sand or scrape one you are not sure of.

A mist coat is runny. Roll over drips before they dry.

How to do it

  1. Move the furniture to the middle of the room and cover it and the floor with dust sheets.
  2. Wash the walls with sugar soap, rinse them and let them dry.
  3. Fill cracks and holes, let the filler dry, then sand it flush with the wall.
  4. Run caulk into the gaps along the skirting and round the frames, and smooth it with a wet finger.
  5. Tape the edges of the skirting, the frames and the switches.
  6. On new plaster, put the mist coat on first and let it dry. Matt Vinyl: recoat after 4 hours at 20 °C (Crown Trade).
  7. Paint the ceiling first: cut in round its edges with a brush, then roll the rest.
  8. Paint the walls the same way: cut in, then roll one wall at a time while the edge is still wet.
  9. Leave each coat as long as the tin says, then put on the second. Peel the tape off before the last coat is hard. 1 to 4 hours between coats (Ten makers of matt emulsion).
  10. Paint the woodwork last, once the walls are dry: prime bare wood first.

How long it takes

A decorator takes about 1 day for a small bedroom and 2 days for a medium room (MyJobQuote and Which?). Difficulty: easy.

Tools and materials

  • Dust sheets to protect the floor and the furniture.
  • Sugar soap, to wash grease and dirt off the walls before painting.
  • A bucket and a sponge.
  • Filler for cracks and holes before painting.
  • A filling knife, to press filler into cracks and holes.
  • Sandpaper, to key glossy paint and smooth filled patches.
  • Decorator's caulk: a flexible filler for the gaps between the walls, the skirting and the frames.
  • Masking tape, to keep paint off the skirting, the frames and the switches.
  • A mist coat: thinned emulsion put on new plaster first, so the coats over it stick.
  • Emulsion for the ceiling.
  • An extension pole for the roller, for the ceiling and high walls.
  • Emulsion for the walls.
  • Paintbrushes for the edges and the woodwork.
  • A roller for the walls and the ceiling.
  • A roller tray.
  • Paint for the doors, the frames and the skirting, usually a satinwood or a gloss.
  • Primer for bare wood, so the paint sticks and lasts.

Common mistakes

  • Painting over dirt or grease. The paint will not grip: wash the walls first.
  • Putting the next coat on too soon. Leave the time the tin says, longer in a cold or damp room.
  • Leaving filler proud of the wall. Sand it flush, or it shows through two coats.
  • Rolling a wall in bits and coming back to it. Finish one wall at a time so the edges do not dry in stripes.
  • Painting new plaster at full strength. It peels: mist coat or prime it first.

When to get someone in

Get a decorator in for a stairwell or a ceiling you cannot reach safely from steps, for old paint that may contain lead, or for a textured ceiling put up before 2000, which may contain asbestos.

Having it done, painting a room (walls and ceiling): labour only, £8 to £25 per m² and £150 to £990 per room; with materials, £10 to £20 per m² and £200 to £1,650 per room; materials not stated, £400 to £700 per room. These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: painting a room (walls and ceiling).

Sources

The steps' times and waits:

  • MyJobQuote: a small bedroom of 10 to 12 m², one day, read 17 October 2026.
  • Which?: a medium room, 3.3 m by 3 m, about two days, read 3 October 2026.
  • Crown Trade: Matt Vinyl: recoat after 4 hours at 20 °C and 65% relative humidity, read 5 October 2026.
  • Ten makers of matt emulsion: between 1 and 4 hours before the next coat, read 29 September 2026.

Questions

How much water do I put in a mist coat?

As much as your paint's own tin or data sheet says. Dulux says 10 parts paint to 1 part water, Valspar's guide 3 parts to 1, and Crown Trade 40% water for its Matt Vinyl. They are different strengths, so do not swap one for the other.

How long does a mist coat take to dry?

Crown Trade's Matt Vinyl can be recoated after 4 hours at 20 °C. Valspar's guide says to wait 24 hours before the top coat. A cold or damp room takes longer. Dulux gives no time: let it dry before the top coat.

How many mist coats do I need?

BuildBatch counts one. Valspar's guide and Dulux's advice page each describe a mist coat, then the top coats, and neither says how many.

Do I need a mist coat on new plaster?

Bare plaster needs a first coat that soaks in and seals it. That is a mist coat of emulsion thinned as the tin says, or a primer-sealer made for bare plaster.

How long does new plaster take to dry before painting?

Up to 4 weeks, by Dulux's rule of thumb, depending on the plaster and the weather. Wait until it is one even, pale colour. The plaster maker's instructions set the time.

Can I spray a mist coat?

Yes, if your paint's data sheet allows airless spraying on new plaster. No maker read here gives a spray ratio for a mist coat itself, so ask the paint maker's technical line and test a patch first.

What changed: The title gives Dulux's, Valspar's and Crown Trade's strengths, and the worked example links the paint calculator by its name.