Paint calculator
The tins for walls, ceiling and woodwork.
An example room
Painting a 4 × 3 m room, 2.4 m high, 1 door, 1 window
- Walls
- 1 × 5 L + 1 × 2.5 L. 5.7 L needed. 1.8 L left over
- Ceiling
- 1 × 2.5 L. 2.2 L needed. 0.3 L left over
Walls: with 5 L you would be 0.7 L short.
Built with AI tools; not yet checked by a tradesperson.
Walls: 31 m² × 2 coats ÷ 12 m² a litre (typical figures from 18 paint makers) = 5.2 L, plus 10% spare = 5.7 L.
A 2.4 m ceiling, one standard door and one standard window are counted until you change them.
How many litres and tins of paint a room's walls and ceiling take, and their cost, from its size, doors, windows and the tin's coverage.
Want a figure before you measure? See how much paint a room takes, by room size.
Having it done, painting a room (walls and ceiling): labour only, £8 to £25 per m² and £150 to £990 per room; with materials, £10 to £20 per m² and £200 to £1,650 per room; materials not stated, £400 to £700 per room. These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: painting a room (walls and ceiling).
Having it done, painter and decorator, by the day: labour only, £150 to £350 per day; materials not stated, £230 to £460 per day. These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: painter and decorator, by the day.
How the number is worked out, a worked example and questions
How the number is worked out
- Measure the room. Its length, its width and the height from the floor to the ceiling. A chimney breast, a bay or an alcove is one row under the sizes; a room of another shape can be drawn.
- Take off the doors and windows. Each one's width times its height comes off the walls. Nothing comes off the ceiling.
- Work out the paint. The area times the number of coats, divided by what a litre covers. Until you type your tin's own figure the planner counts 12 m² a litre, a typical figure from the makers' own figures for the emulsions in BuildBatch's catalogue, and two coats.
- Add the spare. 10% for waste and touch-ups, an example figure you can change.
- Buy whole tins. The tins that leave least over. The walls and the ceiling are two paints, counted apart.
What it cannot tell you. How far your paint goes: that depends on the surface, the paint, the change of colour and how it goes on, so the litres are an estimate. What your walls are like: damp, mould, stains, flaking paint and gloss each need preparation or a product of their own, so put them right before you paint. Whether a paint suits the room: follow the maker's instructions for the paint you choose.
Where the figures come from. The 12 m² a litre is a typical figure, found from the makers' own figures for the emulsions in BuildBatch's catalogue, read between 29 September and 12 October 2026, and the masking tape, caulk and dust sheets on the list are counted in typical sizes read on 6 October 2026. The planner's example room and the 10% spare are examples, not a maker's figures. Each typical figure, with the page it was read on, is on the sources page.
A worked example
The planner's example room, the one it opens with: 4 m by 3 m with walls 2.4 m high, one internal door 762 mm wide and 1,981 mm high and one window 0.9 m by 1.2 m. The walls and the ceiling each get 2 coats at 12 m² a litre (a typical figure from 18 paint makers), with 10% spare. These are typical and example figures, not a product's.
| Working | Walls | Ceiling |
|---|---|---|
| Area before the doors and windows | 33.6 m² | 12 m² |
| Doors and windows taken off | 2.59 m² | none |
| Area to paint | 31.01 m² | 12 m² |
| Paint for 2 coats | 5.2 L | 2 L |
| With 10% spare | 5.7 L | 2.2 L |
| Tins to buy | 1 × 5 L + 1 × 2.5 L | 1 × 2.5 L |
| Left over | 1.8 L | 0.3 L |
The walls need 5.7 L, a little more than one 5 L tin, so a 2.5 L tin goes with it: with 5 L alone you would be 0.7 L short. The litres are rounded to one decimal, as the planner shows them; the sums use the unrounded figures. Copy the coverage and the coats from your own tin: they change the answer. When the planner above counts a named paint, it uses that paint's own tins, which can be a different count from these, and says which paint it is.
Work it out for your room, starting from the example room's sizes.
Mistakes that cost a tin
- Leaving out a chimney breast, a bay or an alcove. Each adds wall: a chimney breast 0.35 m deep in a 2.4 m high room adds about 1.7 m², both its sides together. Add it under the sizes, with its wall, its width and its depth.
- Measuring an L-shaped room as the rectangle round it. The walls come out right, the ceiling too big. Under “Change the figures”, say the room is not a rectangle and draw it, corner by corner. Sloping ceilings and stairwells are not worked out: measure each part and add it up.
- Using the tin's figure on new or bare plaster. Fresh plaster drinks the first coat. Answer the question about new plaster under the list, and the planner adds the thinned mist coat.
- Sanding or scraping an old coating before you know what it is. Paint in older homes can contain lead, and textured coatings applied before 2000 can contain asbestos: get advice first.
- Buying one tin size for the walls and the ceiling. They are two paints. Each has its own tin size under “Coats, coverage, spare and tin”.
If a result looks wrong, we want to know: report a problem.
Questions
How much paint do I need for a room?
5.7 L for the walls of a 4 × 3 m room 2.4 m high, with a door and a window, in two coats at 12 m² a litre with 10% spare: 1 × 5 L + 1 × 2.5 L. Its ceiling needs 2.2 L, one 2.5 L tin. Type your room's sizes above for your own.
Does it take off doors and windows?
Yes, from the walls: each one's width times its height. The planner starts with one internal door and one window, and you can change, add or remove them. Nothing is taken off the ceiling.
How many coats does it count?
Two, until you type the number the tin gives for your surface. New plaster takes a thinned mist coat first, and a strong change of colour may take a third coat: the questions under the list ask, and the litres follow.
What coverage does it use?
12 m² a litre, a typical figure: the lower middle of the makers' own figures for the emulsions in BuildBatch's catalogue. The tin's own figure comes first: type it under “Coats, coverage, spare and tin”, or choose the product.
Does the tin size change how much paint I need?
No, only how many tins. In the example the walls need 5.7 L: that is 1 × 5 L + 1 × 2.5 L, the tins that leave least over. A tin size typed for the walls or the ceiling counts that size only. The 10% spare, for waste and touch-ups, is an example figure you can change.
Does it count the woodwork?
Yes, when you tick it: the doors, their frames and the skirting, in two coats of satinwood at a typical 16 m² a litre, worked out from the room's size and its doors and windows. Your tin's own figure replaces it.