Concrete calculator
Bags, a site mix or ready-mix, for a slab.
An example slab
0.66 m³ of concrete with 10% extra, for a 3 × 2 m slab, 100 mm thick
- Cement
- 10 × 25 kg. for 0.66 m³ of concrete
- All-in ballast
- 2 bulk bags. for 0.66 m³ of concrete
Built with AI tools; not yet checked by a tradesperson.
Concrete for one slab or shed base of even thickness: whole bags, cement with sand and aggregate, or cubic metres to order.
Want a figure before you measure? See how many bags of concrete a shed base takes, by shed size.
Having it done, laying a concrete base: labour only, £220 to £450 per day and £15 to £50 per m²; with materials, £50 to £140 per m² and £700 to £1,300 per job; materials not stated, £160 to £430 per day and £40 to £80 per m². These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: laying a concrete base.
How the number is worked out, a worked example and questions
How the number is worked out
- Measure the slab. Its length and width, or draw its shape if it is not a rectangle. The area is what is left after the formwork is in.
- Enter the thickness you have decided on. The calculator starts at 100 mm, labelled as an example and not advice: the thickness depends on what the slab is for and what it sits on, so enter the one decided for the slab.
- Add the allowance. The area times the thickness is the volume; a visible percentage is added once for an uneven base and spillage.
- Count bags, mix it yourself, or order by volume. For bags, the volume is divided by what one bag makes, as printed on the bag, and rounded up once to whole bags. Mixed on site, the cement, sand and coarse aggregate (or all-in ballast) are the quantities Tarmac publishes for 2.5 m³ of a general purpose mix with all-in ballast, scaled to the slab: cement up to whole 25 kg bags, the aggregates up to the half cubic metre the maker advises buying in. For ready-mixed concrete it is the cubic metres to order: the supplier rounds it up to the step it sells in. Until you choose, the planner goes by the volume: bags of dry mix up to 0.25 m³, cement and aggregate mixed on site up to 1 m³, and ready-mixed above. That rule is BuildBatch's own, not a maker's, and the page shows what each of the three ways takes.
This is a material quantity, not a design. It does not decide the thickness, what goes under the slab, whether a membrane or reinforcement is needed, which mix a slab needs, or whether building control must be told.
Where the figures come from. The bag that makes 0.01 m³ and weighs 20 kg, the 100 mm thickness and the 10% extra are examples, not a maker's figures or a design. Mixed on site, the cement and aggregate are the quantities Tarmac publishes, read on 9 October 2026, and a bulk bag of ballast is taken at about 0.5 m³, read on 10 October 2026. The sub-base's typical 100 mm, the 75 mm it runs past the slab, a bulk bag of Type 1 at about 0.38 m³ once compacted and the 50 m² membrane roll were read on 12 October 2026. Each, with the page it was read on, is on the sources page.
A worked example
A shed base 2.4 m × 1.8 m is 4.32 m². At 100 mm thick, with 10% extra, and bags that each make 0.01 m³ and weigh 20 kg. These are example figures, not a product or a design.
| Working | Figure | Result |
|---|---|---|
| Slab area | 2.4 m × 1.8 m | 4.32 m² |
| Volume at the thickness | 100 mm | 0.432 m³ |
| With 10% extra | 10% | 0.4752 m³ |
| Divide by 0.01 m³ a bag and round up | 47.52 | 48 bags |
| To carry and mix | 20 kg a bag | 960 kg |
| Ready-mixed instead, in 0.25 m³ steps | 0.25 m³ | 0.5 m³ |
| Mixed on site instead: cement, at Tarmac's 35 bags for 2.5 m³ of general purpose mix | 6.6528 bags | 7 bags of 25 kg |
| All-in ballast, at 2.5 m³ for 2.5 m³, in bulk bags of about 0.5 m³ | 0.4752 m³ | 0.5 m³ |
With no way chosen the planner counts this base mixed on site: 0.4752 m³ is more than the 0.25 m³ it counts in bags, by its own rule. The yield and the water differ between products: read them off the bag you buy, and buy all the bags from one batch.
Work it out for your room, starting from the example room's sizes.
Stop and check first
- The thickness and the ground. A base for a shed and a floor that takes a load are different slabs. The product's instructions, a designer or building control decide the thickness, the sub-base and any reinforcement.
- What is under it. Concrete goes on a prepared, compacted base, never on soil or turf. How deep, and of what, is for the product's instructions, a designer or building control. Until you enter the depth decided for the job (“Sub-base depth”, in “Change the figures”), the calculator counts a typical 100 mm of Type 1 (MOT), said to be typical and not a design: 75 mm wider than the slab all round for the formwork, with 10% for spreading and an uneven dig, in bulk bags of about 0.38 m³ once compacted or in 25 kg bags, so nothing is added for settlement. The figure is named on the line, and the figure from the bag you buy replaces it. For a sub-base on its own, by its area and depth and with its weight, use the MOT Type 1 calculator.
- A membrane. A damp-proof membrane under the slab depends on what the slab is for: the list asks whether the slab is a floor or the base of a building, and counts a 50 m² roll if it is. Allow for laps and a turn-up at the edges.
- The weather and the working time. The bag's instructions give temperature limits, how long the mix can be worked, and how long to protect the new concrete. Have everything ready before the first mix.
- Carrying it. Forty-eight bags is nearly a tonne to move and mix by hand. A mixer or a ready-mixed delivery is the usual answer for anything but the smallest base.
Questions
How many 20 kg bags of concrete make 1 m³?
100, at 0.01 m³ a 20 kg bag, the example bag's figure: the example slab's 0.4752 m³ is 48 bags. Your bag says what it makes.
How many 25 kg bags of cement for 1 m³ of concrete?
14, mixed on site at the general-purpose mix Tarmac publishes: the example's 0.4752 m³ takes 6.6528 bags, so 7 bags of 25 kg, with 0.5 m³ of ballast.
How thick should the slab be?
BuildBatch does not say. The example uses 100 mm because it is a round figure for the sum, not a recommendation. The right thickness depends on the load, the ground and what the slab is for; the product's instructions, a designer or building control decide it.
Bags or ready-mixed?
Choose in the calculator: “Three ways to buy the concrete” shows what each takes, with the one usual for a slab of that volume marked. Until you choose, the planner counts bags of dry mix up to 0.25 m³, cement and aggregate mixed on site up to 1 m³ and ready-mixed above, a rule of its own and not a maker's. Bags are counted and weighed; ready-mixed concrete is a volume to order, which the supplier rounds up to the step it sells in. Suppliers also have a minimum load, half a cubic metre or one on the pages read: ask.
Can I work out cement and ballast instead?
Yes: choose the mix on site among the three ways to buy the concrete. The quantities are the ones Tarmac publishes for 2.5 m³ of a general purpose mix with all-in ballast, on a help page dated 24 November 2020 and read on 9 October 2026, scaled to your slab, and the list says so on each line: a typical figure, not a design. Cement is counted in whole 25 kg bags; the ballast in whole bulk bags (about 0.5 m³ each, a figure read from suppliers' own pages and named on the line) or 25 kg bags, as you choose in “Change the figures”. The sub-base is counted in bags too (see the next question).
How many bags of sub-base?
BuildBatch counts bags, not tonnes. The sub-base is laid 75 mm wider than the slab all round, for the formwork; that area times the depth is the compacted volume, 10% is added for spreading and an uneven dig, and the bags are counted on that, with a bulk bag taken at about 0.38 m³ once compacted (named on the line). Under the 4.32 m² base it is 4.9725 m² at a typical 100 mm, 0.546975 m³ with the 10%: 2 bulk bags, or 46 bags of 25 kg. Enter the depth decided for the job in “Sub-base depth”, in “Change the figures”; a tonnage, if your supplier sells by weight, is the supplier's to work out from its own figure.