What you need to lay laminate flooring, and how to lay it

6 min read · Updated 8 November 2026

A 4 × 3 m room takes 8 packs of laminate that cover 1.835 m² each, 1 roll of underlay, 6 lengths of scotia and a door bar. Work out the floor’s area, add 10% for cuts, divide by what one pack covers and round up.

Built with AI tools; not yet checked by a tradesperson.

Read here; this page sends and keeps nothing.

Work out the flooring for this room, then change it to yours

A rectangle in plan, to scale: 12 m², its sides 4 m, 3 m, 4 m and 3 m. Laid with 1288 × 195 mm boards along the length, with a 10 mm gap at the walls: 16 rows and 52 boards as laid before any spare. 5 rows start with an offcut; 12 pieces come from offcuts. The first row is 125 mm wide and the last 125 mm.4 m · first row 125 mm3 m4 m · last row 125 mm3 ma new boardfrom an offcut (12)16 rows of 1288 × 195 mm: 52 boards as laid
A 4 × 3 m floor in 1288 × 195 mm boards, a typical size: 16 rows, the first and last cut to the same width, each row started with an offcut where one fits, and a 10 mm gap at every wall for the floor to move.

The sum

Packs = the floor’s area × 1.1 ÷ what one pack covers, rounded up.

  • The area is the room’s length × its width. Split an L-shaped room into rectangles, or draw it.
  • The 10% is for the cuts at the walls and the ends of the rows.
  • What one pack covers is printed on the pack, in m².
  • Underlay covers the floor’s own area, with no 10%: one roll of 15 m² does up to 15 m² of floor.
  • Scotia runs round the walls, less the doorways, with 5 cm a wall for the corner cuts, in 2.4 m lengths.
  • Door bars: one for each doorway where the new floor meets another.

Worked example

A bedroom 4 m × 3 m upstairs, on timber boards, with one door 762 mm wide. The packs cover 1.835 m² each, Quick-Step’s own figure for its Impressive 8 mm boards and the smaller of the two makers’ pack sizes the planner offers, and the underlay comes in 15 m² rolls.

Item Working To buy
Laminate 12 m² + 10% = 13.2 m²; 13.2 ÷ 1.835 = 7.2 8 packs, 1.48 m² over
Underlay 12 m² ÷ 15 m² = 0.8 1 roll
Damp-proof membrane A timber floor upstairs None
Scotia 13.2 m of wall + 4 × 5 cm = 13.44 m; ÷ 2.4 m = 5.6 6 lengths
Door bar One doorway 1
Underlay tape, spacers, a fitting kit, knee pads, gloves and a dust mask One room One of each

Put the same room on a concrete ground floor and add a damp-proof membrane: one 50 m² roll does this floor. Leave it out if your underlay has a membrane built in.

What changes it

  • Your pack. The sum above counts the smaller of two makers’ sizes, 1.835 m², so it is not short for a pack of 1.835 m² or more. In Kellars’ 2.131 m² packs this floor takes 7. A pack that covers less than 1.835 m² can take more: use the m² printed on your pack.
  • A concrete or ground floor. A membrane goes under the underlay, with its edges overlapped and taped.
  • The skirting. If it comes off and goes back on over the new floor, you need no scotia.
  • Underlay on the boards. Boards with underlay attached need no more under them.
  • The colour. Buy every pack at once, and check the batch or lot number matches: the colour can differ from one batch to the next.
  • The old floor. Old floor tiles and the adhesive under them can contain asbestos. Do not sand or scrape them: get advice first.

Painting the room too? Paint first, then lay the floor: painting and a new floor in the same room.

How to do it

  1. Leave the packs flat and unopened in the room, away from the walls, so the boards settle to its warmth and damp. EGGER's laminate: at least 48 hours, in a room at 18 °C or more (EGGER).
  2. Make the floor flat, clean and dry: screw down loose boards and fill dips in a concrete floor with smoothing compound.
  3. On a concrete or ground floor, lay the damp-proof membrane first, with its edges overlapped and taped.
  4. Roll the underlay out across the room, butt the strips together and tape the joins.
  5. Lay the first row along the longest straight wall, tongue side to the wall, with spacers to hold the gap at the wall.
  6. Click each row into the last, and start it with the offcut from the row before, so the end joints never line up.
  7. Cut the last row to width, still leaving the gap at the wall, and pull it into place with a pull bar.
  8. Take the spacers out, fit a door bar across each doorway, and cover the gap at the walls with scotia or the skirting.

How long it takes

A fitter takes one to two days for a small room of 10 to 15 m², and up to three days for a bigger one (MyJobQuote and BookaBuilderUK). Difficulty: moderate.

Tools and materials

  • The floor itself: laminate, wood, vinyl planks or tiles, sold in packs or boxes.
  • Smoothing compound, or a plywood overlay, that makes the floor flat enough for a thin covering.
  • A damp-proof membrane: a sheet or coating that keeps moisture in a concrete floor from reaching the new floor.
  • Tape that joins the strips of underlay so they do not move apart.
  • The thin layer under a laminate or wood floor that evens out small bumps and deadens footsteps.
  • Expansion spacers: wedges that keep the gap round the edge while a floating floor is laid.
  • A fitting kit for the floor: a knife, a straight edge, and the trowel or roller its fitting needs.
  • Knee pads, gloves, safety glasses and a dust mask for laying a floor.
  • A door bar: the strip across a doorway that finishes the floor's edge where it meets the next room.
  • Scotia: the thin moulding that hides the expansion gap along the skirting.

Common mistakes

  • Laying the boards the day they arrive. They move once laid: leave the packs flat in the room first.
  • Leaving no gap at the walls. The floor swells and lifts: keep the gap all round, under the door frames too.
  • Lining up the end joints. The floor is weaker and the joins show: start each row with the last row's offcut.
  • Laying over a concrete floor with no membrane. Damp comes up and the boards swell: put a membrane down first, or use an underlay with one built in.
  • Nailing the scotia to the floor. A floating floor has to move: fix the scotia to the skirting.

When to get someone in

Get a fitter in for a floor that needs levelling, stairs, a herringbone pattern, or a wood floor that is glued or nailed down.

Having it done, laying laminate flooring: labour only, £5 to £40 per m². These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: laying laminate flooring.

Sources

  • The 1.835 m² pack is Quick-Step’s own figure for its Impressive 8 mm laminate, on its own page, read 17 October 2026, and the 2.131 m² pack Kellars’ own figure for its Forma Advanced 8 mm laminate, in its own Forma guide, read 19 October 2026 (sources). Neither is your product’s: use your own pack’s.
  • The 10% for cuts is BuildBatch’s example figure, not a product’s.
  • The 15 m² underlay roll: two makers’ and merchants’ rolls, read 12 October 2026. The 2.4 m scotia: Richard Burbidge’s own pages, read 12 October 2026 (sources).
  • EGGER: how to lay laminate flooring, read 19 October 2026: the 48 hours in the room, and a gap of 8 to 10 mm at the walls.

The steps' times and waits:

  • MyJobQuote: laminate fitting time: "Small room (10-15m²): 1-2 days" (page updated 9 July 2026), read 19 October 2026.
  • BookaBuilderUK: timeframes for flooring installation: "Laminate. 1 to 3 days depending on size", read 19 October 2026.
  • EGGER: how to lay laminate flooring: "lay the packages flat in the room and leave them for at least 48 hours", the room at least 18 °C, read 19 October 2026.

Questions

What tools do I need to lay laminate flooring?

A tapping block and a pull bar to close the joints, a saw for the ends of the rows, and spacers to hold the gap at the walls. Add knee pads, gloves and a dust mask: you lay it kneeling, and cutting boards makes dust.

Do I need underlay under laminate?

Yes, unless the boards have underlay attached. It covers the floor's own area, without the 10% for cuts: one 15 m² roll does a 12 m² floor.

Do I need a damp-proof membrane under laminate?

On a concrete or ground floor, yes: it goes under the underlay, unless the underlay has one built in. A timber floor upstairs needs none.

How many packs of laminate for a 4 m by 3 m room?

8 packs of 1.835 m², Quick-Step's own pack size for one range. The floor is 12 m², 13.2 m² with 10% for cuts, and 13.2 ÷ 1.835 = 7.2, rounded up. In Kellars' 2.131 m² packs it is 7. Use the m² printed on your pack.

How long does laminate need to acclimatise?

At least 48 hours for EGGER's laminate, the packs flat and unopened in the room at 18 °C or more. Your flooring's own instructions give its time.

What changed: The worked example counts Quick-Step's 1.835 m² packs, the smaller of the two makers' pack sizes the planner offers, as the planner now does, where it used an example 2 m² pack.