What you need to paint a room: the complete checklist
A 4.2 × 3.6 m room needs a 5 L and a 2.5 L tin of wall paint and a 5 L tin for the ceiling. Add 12 more things to prepare the walls and put the paint on: the list below says how much of each.
Read here; this page sends and keeps nothing.
Work out the paint for this room, then change it to yoursThe planner can count a shop's own tins, so its count may differ.
The sum
- Paint = the area × 2 coats ÷ 12 m² a litre × 1.1, then rounded up to tins. Work the walls and the ceiling apart: how much paint do I need?, or the paint calculator for your own room’s sizes.
- Caulk runs along the top of the skirting and round the door and window frames, at about 10 m a 300 ml cartridge.
- Masking tape runs round every edge you mask: the skirting, the ceiling line and the frames.
- Dust sheets cover the floor once, with more for the furniture left in the room.
- The rest is one of each: one sleeve for each paint.
Worked example
A room 4.2 m × 3.6 m, 2.4 m high, with one door 826 × 1981 mm and one window 1200 × 1100 mm. The walls and the ceiling were painted before and are sound.
| Item | For this room | Why |
|---|---|---|
| Wall paint | 34.5 m² of wall, 6.3 L: 1 × 5 L tin and 1 × 2.5 L tin | Two coats at 12 m² a litre, plus 10% |
| Ceiling paint | 15.1 m² of ceiling, 2.8 L: 1 × 5 L tin | The same sum; usually a different paint |
| Primer or mist coat | None | Sound paint needs none |
| Sugar soap | 1 container | Grease stops the paint gripping |
| Filler | A small tub or tube | Cracks and holes |
| Decorator’s caulk | about 24.2 m of edges, along the top of the skirting and round the door and window frames: 3 cartridges of about 300 ml | Gaps that would show |
| Sandpaper | A few sheets | To sand the filler flush |
| Masking tape | about 41.4 m of edges: one 50 m roll | Clean edges at the skirting, the ceiling and the frames |
| Dust sheets | 2 sheets of the typical 3.6 m × 2.7 m | The 15.1 m² floor, once |
| Roller frame and sleeves | 1 frame, 2 sleeves | One sleeve for each paint |
| Roller tray | 1 | |
| Cutting-in brush | 1 | The edges |
| Extension pole | 1 | The ceiling |
| Filling knife | 1 | The filler |
| Dust mask, eye protection and gloves | A set each | Sanding and sugar soap |
Add a bucket, a sponge, clean cloths, and something to stir with and lever the lids off.
What changes it
- New or bare plaster. It needs a mist coat before the two coats: mist coat ratio and drying time.
- Stains that show through. Find the cause, then put a stain-blocking primer on the patches.
- Damp or mould. Fix the cause first. Paint cures neither.
- Flaking, powdery or glossy paint. Scrape and sand it, and use more filler. Glossy paint needs an adhesion primer.
- Wallpaper or a textured coating. Strip the paper. Have an old textured coating tested before you touch it.
- The woodwork. It takes its own paint, usually a satinwood, and a brush. Prime bare wood first.
- A new floor too. Paint first and lay the floor last: paint or lay the new floor first?
- Time between coats. Your tin gives it: how long between coats of paint.
- A ceiling on its own. It has its own list: painting a ceiling: how much paint and what else to buy.
Old paint can contain lead, and textured coatings put up before 2000 can contain asbestos: do not sand or scrape one you are not sure of.
How to do it
- Move the furniture to the middle of the room and cover it and the floor with dust sheets.
- Wash the walls with sugar soap, rinse them and let them dry.
- Fill cracks and holes, let the filler dry, then sand it flush with the wall.
- Run caulk into the gaps along the skirting and round the frames, and smooth it with a wet finger.
- Tape the edges of the skirting, the frames and the switches.
- On new plaster, put the mist coat on first and let it dry.
- Paint the ceiling first: cut in round its edges with a brush, then roll the rest.
- Paint the walls the same way: cut in, then roll one wall at a time while the edge is still wet.
- Leave each coat as long as the tin says, then put on the second. Peel the tape off before the last coat is hard.
- Paint the woodwork last, once the walls are dry: prime bare wood first.
How long it takes
A decorator takes about 1 day for a small bedroom and 2 days for a medium room (MyJobQuote and Which?). Difficulty: easy.
Tools and materials
- Dust sheets to protect the floor and the furniture.
- Sugar soap, to wash grease and dirt off the walls before painting.
- A bucket and a sponge.
- Filler for cracks and holes before painting.
- A filling knife, to press filler into cracks and holes.
- Sandpaper, to key glossy paint and smooth filled patches.
- Decorator's caulk: a flexible filler for the gaps between the walls, the skirting and the frames.
- Masking tape, to keep paint off the skirting, the frames and the switches.
- A mist coat: thinned emulsion put on new plaster first, so the coats over it stick.
- Emulsion for the ceiling.
- An extension pole for the roller, for the ceiling and high walls.
- Emulsion for the walls.
- Paintbrushes for the edges and the woodwork.
- A roller for the walls and the ceiling.
- A roller tray.
- Paint for the doors, the frames and the skirting, usually a satinwood or a gloss.
- Primer for bare wood, so the paint sticks and lasts.
Common mistakes
- Painting over dirt or grease. The paint will not grip: wash the walls first.
- Putting the next coat on too soon. Leave the time the tin says, longer in a cold or damp room.
- Leaving filler proud of the wall. Sand it flush, or it shows through two coats.
- Rolling a wall in bits and coming back to it. Finish one wall at a time so the edges do not dry in stripes.
- Painting new plaster at full strength. It peels: mist coat or prime it first.
When to get someone in
Get a decorator in for a stairwell or a ceiling you cannot reach safely from steps, for old paint that may contain lead, or for a textured ceiling put up before 2000, which may contain asbestos.
Having it done, painting a room (walls and ceiling): labour only, £8 to £25 per m² and £150 to £990 per room; with materials, £10 to £20 per m² and £200 to £1,650 per room; materials not stated, £400 to £700 per room. These are published UK figures, each its publisher's own, and not a quote: every figure, its source and the sum for a room: painting a room (walls and ceiling).
Sources
- The 12 m² a litre: the lower middle of 18 makers’ emulsion figures, read 29 September to 12 October 2026 (how much paint do I need?).
- The caulk’s 10 m a cartridge: the middle of six makers’ data sheets for a 6 mm bead. The 50 m roll of masking tape: the commonest length in five makers’ ranges. The 3.6 × 2.7 m dust sheet: the size five makers sell a cotton sheet in. All read 6 October 2026, each on the sources page.
The steps' times and waits:
- MyJobQuote: a small bedroom of 10 to 12 m², one day, read 17 October 2026.
- Which?: a medium room, 3.3 m by 3 m, about two days, read 3 October 2026.
- Crown Trade: Matt Vinyl: recoat after 4 hours at 20 °C and 65% relative humidity, read 5 October 2026.
- Ten makers of matt emulsion: between 1 and 4 hours before the next coat, read 29 September 2026.
Questions
Do I need primer to paint a room?
Not on walls painted before and still sound. Bare plaster needs a mist coat or a primer-sealer, stains need a stain-blocking primer, and glossy paint needs sanding or an adhesion primer.
How many roller sleeves do I need?
One frame and a sleeve for each paint. With a wall paint and a ceiling paint that is two sleeves, so neither has to be washed out between them.
How many cartridges of caulk for a room?
About 3 of 300 ml for a 4.2 × 3.6 m room: 24.2 m along the top of the skirting and round the frames, at about 10 m a cartridge. A wide gap takes more.