How much underlay do I need?
Underlay covers the floor itself and is bought in whole rolls: divide the floor’s area by the m² printed on the roll and round up. The extra bought for cutting the boards is not added to it. A 4 m × 3 m floor is 12 m², so it needs one roll that covers 15 m², or two rolls that cover 10 m².
Read here; this page sends and keeps nothing.
Work out the flooring for this room, then change it to yours

The three steps
- Floor area = length × width, in metres. For an L-shaped or awkward room, split the floor into rectangles and add them.
- Rolls = floor area ÷ the m² one roll covers.
- Round up to a whole roll.
The flooring is bought with an extra for cuts, 10% in BuildBatch’s example, because every row ends in a cut board. The underlay is not: its strips are laid edge to edge and trimmed at the walls, so BuildBatch counts it for the floor’s own area.
Where the roll coverage comes from
It is printed on the roll, in m². Roll sizes vary a lot from one underlay to another: thin foam usually comes on bigger rolls than dense acoustic underlay or underlay for vinyl planks. The planner starts with a roll of 15 m², a typical figure found from two publishers’ rolls (Interfloor’s Duralay Timbermate Excel is 15.07 m² a roll, read 12 October 2026, and Flooring Surgeons’ Silver Grade foam underlay 15 m², read 18 October 2026), and says so on the line. Rolls of 10 and 20 m², and packs of boards of about 10 m², are sold too.
Worked example
A floor 4 m × 3 m.
- Floor area: 4 × 3 = 12 m²
- On rolls of 15 m²: 12 ÷ 15 = 0.8, so 1 roll, about 3 m² over
- On rolls of 10 m²: 12 ÷ 10 = 1.2, so 2 rolls, 20 m², about 8 m² over
- On rolls of 7 m²: 12 ÷ 7 = 1.71, so 2 rolls, 14 m², about 2 m² over
Same floor, three roll sizes, three different amounts left over. Only the 15 m² roll is the planner’s typical figure; the others are sizes typed in.
A quick table
The floor’s own area, in four roll sizes:
| Floor | Rolls of 7 m² | Rolls of 10 m² | Rolls of 15 m² | Rolls of 20 m² |
|---|---|---|---|---|
| 3 m × 3 m = 9 m² | 2 | 1 | 1 | 1 |
| 4 m × 3 m = 12 m² | 2 | 2 | 1 | 1 |
| 4.2 m × 3.6 m = 15.12 m² | 3 | 2 | 2 | 1 |
| 5 m × 4 m = 20 m² | 3 | 2 | 2 | 1 |
| 6 m × 4.5 m = 27 m² | 4 | 3 | 2 | 2 |
One row is exact. The 5 m × 4 m floor on two 10 m² rolls, or on one 20 m² roll, leaves nothing over. The sum takes the m² on the roll as it is, so a count that close leaves nothing spare for a strip trimmed badly: check the roll’s figure and the room’s measurements before you rely on it, or buy the next roll.
The 4.2 m × 3.6 m floor shows the other side of whole rolls. It is 0.12 m² more than one 15 m² roll covers, so it takes two, and about 14.9 m² is left over.
When you need none
Boards with underlay attached need none. A glued-down floor takes none at all; it takes adhesive instead. The flooring’s instructions decide, so read them before you buy a roll.
When a membrane is a separate line
On a concrete or ground floor, a moisture barrier usually goes under the underlay unless the underlay has one built in. Check the underlay first. If it has none, a separate membrane goes on the list, covering the same floor: 12 m² in the example, before its laps. BuildBatch counts it as one 50 m² roll, the smallest roll of damp-proof membrane read (Visqueen’s 4 × 12.5 m High Performance Damp Proof Membrane), and says that an offcut or a smaller roll may do. The membrane’s roll says what it covers; tape the overlaps as its instructions say.
A suspended timber floor above a ventilated void does not usually need one. New concrete must be dry enough before any floor goes down, and the flooring’s instructions give the test. Which floors need what is in underlay and damp-proof membranes.
The joins between underlay strips are sealed with tape, and so are a membrane’s overlaps. One roll of tape usually does a room; the roll length and the number of joins decide.
Carpet underlay is counted differently
Under carpet, BuildBatch counts the underlay from the measured floor with no extra. A 4.2 m × 3.6 m room is 15.12 m², and at the planner’s example of a roll or pack covering 15.07 m², an example figure and not a product’s, that is 2 rolls: the floor is 0.05 m² more than one covers. See how much carpet do I need? and the carpet calculator.
What to check first
- Whether the floor needs underlay at all: the flooring’s instructions say.
- Whether the underlay has a moisture barrier built in, if the floor is concrete or on the ground floor.
- Underfloor heating. Both the flooring and the underlay say whether they suit it.
- The m² on the roll. It changes from one underlay to the next.
Do it with BuildBatch
Open the flooring calculator and type the room. The shopping list counts the underlay in whole rolls of about 15 m² and asks “Is underlay already attached to the boards?”; the line shows what is left over. Say what the floor is laid on, and the membrane, the joining tape and the rest of the floor’s lines follow. What you need to lay laminate flooring goes through that list line by line.
What this guide does not cover
Which underlay suits which floor. Sound insulation rules for flats. Finding the cause of damp. Stairs. Adhesives for glued floors.
Related guides
Questions
How much underlay for a 4 m by 3 m room?
12 m², the floor's own area: the extra bought for cutting the boards is not added to the underlay. That is one roll that covers 15 m², or two rolls that cover 10 m². BuildBatch counts a 15 m² roll, a typical figure: use the m² printed on your roll.
Do I add wastage to underlay?
BuildBatch does not. The strips are laid edge to edge and trimmed at the walls, and rounding up to whole rolls usually leaves more than a percentage would: 12 m² bought as one 15 m² roll leaves about 3 m² over.
Is a damp-proof membrane the same as underlay?
No. On a concrete or ground floor a moisture barrier usually goes under the underlay, unless the underlay has one built in. It is a separate line on the list, covering the same floor, and it is counted in its own roll: 50 m², the smallest roll of membrane read (Visqueen's 4 × 12.5 m).
Do I need underlay if the boards have it attached?
No. Boards with underlay attached need none, and a glued-down floor takes none. The flooring's instructions decide.