On a concrete or screed ground floor, a floating laminate or wood floor usually goes over a moisture barrier: an underlay with one built in, or a damp-proof membrane under plain underlay. The flooring’s own instructions decide which, and how the joins are taped. For a 4.2 × 3.6 m room, 15.12 m² of floor, BuildBatch counts 2 rolls of underlay at a typical 15 m² a roll (Interfloor’s Duralay Timbermate Excel roll is 15.07 m² and Flooring Surgeons’ Silver Grade foam roll 15 m²) and, if a membrane is needed, one 50 m² roll, the smallest roll of membrane read: Visqueen’s 4 × 12.5 m High Performance Damp Proof Membrane.

Built with AI tools; not yet checked by a tradesperson.

Read here; this page sends and keeps nothing.

Work out the flooring for this room, then change it to yours

A concrete floor under blue-tinted damp-proof membrane lapped up the wall, with a taped strip of foam underlay.

Three questions

  1. How is the floor fitted? A floating floor, where the boards click together and sit loose on the subfloor, usually needs underlay. Boards with underlay attached need none. A glued-down floor takes none at all; it takes adhesive instead.
  2. What is under it? Concrete or screed holds moisture. A suspended timber floor over a ventilated void does not usually need a barrier. Boards or sheets on an upper floor usually need underlay only.
  3. Is it a ground floor? A concrete ground floor is the usual case for a moisture barrier.

Answer those three and most of the list writes itself. Where it does not, the flooring’s instructions are the source, not a rule of thumb.

Underlay

  • It is sold in rolls, and roll sizes vary a lot from one underlay to another: thin foam usually comes on bigger rolls than dense acoustic underlay or underlay for vinyl planks. Take the figure off the roll.
  • The area to cover is the floor itself. BuildBatch does not add the flooring’s extra for cuts to the underlay.
  • Joins between strips are taped. One roll of joining tape usually does a room; the roll length and the number of joins decide.
  • Underfloor heating: both the flooring and the underlay say whether they suit it. Check first.

Damp-proof membranes and moisture barriers

  • On concrete or a ground floor, a moisture barrier usually goes under the underlay unless the underlay has one built in. It covers the same area as the floor, with the overlaps taped as its instructions say.
  • New concrete must be dry enough before any floor goes down. The flooring’s instructions give the test. Do not guess a drying time.
  • A membrane is not a cure for a damp floor. If a floor is damp, or you are not sure, find the cause first and get advice.
  • A suspended timber floor above a ventilated void does not usually need one. The flooring’s instructions decide.

Worked example

The example room’s floor is 15.12 m², and the underlay is counted for that: the flooring’s 10% for cuts is not added to it.

  • Underlay on rolls of 15 m²: 15.12 ÷ 15 = 1.01, so 2 rolls, 30 m², about 14.9 m² over
  • Underlay on rolls of 10 m²: 15.12 ÷ 10 = 1.51, so 2 rolls, 20 m², about 4.9 m² over
  • Underlay on rolls of 7 m²: 15.12 ÷ 7 = 2.16, so 3 rolls, 21 m²

Same floor, three roll sizes, three different amounts left over. The 15 m² roll is the planner’s typical figure, and this floor is just over one. If a membrane is needed, BuildBatch measures it on the same 15.12 m² of floor, before its laps, and counts one 50 m² roll, the smallest roll of damp-proof membrane read (Visqueen’s 4 × 12.5 m): an offcut or a smaller roll may do. The roll says what it covers.

How BuildBatch lists it

  • Underlay is counted from the start in whole rolls of a typical 15 m², and its line asks “Is underlay already attached to the boards?” Answer that it is attached, or that the floor is glued down, and it is not needed; say you have some and it is marked as already had.
  • Damp-proof membrane or moisture barrier waits on what is under the floor. For a concrete or ground floor it is counted as one 50 m² roll, still to decide, and asks “Does the underlay have a moisture barrier built in?” For a suspended timber floor above the ground floor it is not needed.
  • Underlay joining tape and expansion spacers follow the same answers.

Do it with BuildBatch

Open the flooring calculator, type the room, and under “What the floor is laid on” in “Change the figures” say what the floor is going onto and whether it is a ground floor. The underlay and membrane lines in the shopping list change to match, and each asks the one thing it still needs to know.

What this guide does not cover

Finding the cause of damp. Screeds, levelling compound and subfloor repairs. The design of underfloor heating. Sound insulation rules for flats. Adhesives for glued floors. For any of those, the flooring’s instructions and a professional come first.

Sources

The typical 15 m² roll is found from two publishers’ rolls. The 50 m² roll of membrane is the smallest read, Visqueen’s:

Every typical figure the planner uses, with where it was read, is on where the figures come from.

Questions

My underlay says it has a built-in moisture barrier. Do I still need a membrane?

Usually not, on a floor the flooring's instructions allow. Check that the joins are taped as the underlay's instructions say. If the floor is new concrete, it must be dry enough first, and the flooring's instructions give the test.

What changed: The opening says what the typical 15 m² roll was found from, and whose is the 50 m² roll of membrane.